Daya Bay Sludge Resource Disposal Project Sludge Resource Disposal Equipment Procurement and Installation Project

Design scale: ≥70m³/h, calculated based on the moisture content of 40% of the wet foundation of the sludge, and meeting the standard set by the customer

Project background

The expansion of regional municipal pipe networks (a new sewage pipe network of 12.227 kilometers will be built in 2024) will aggravate the pressure of sludge accumulation. Water bodies such as the Mamiao River have hidden dangers of water quality deterioration due to sludge deposition, and systematic dredging and harmless disposal are urgently needed.